Case Studies

C6AM Charger in front of a pink hotel building

Arrowhead Travel Plaza

Pendelton, Oregon

October 2025

XCharge North America partnered with Wildhorse Resort & Casino's Arrowhead Travel Plaza to deploy the state's first solar integrated EV charging station with four dual-dispenser GridLink units with 40kW feeding 860kWh of total battery storage, GridLink delivers up to 194kW to vehicles split dynamically between two ports.

4

GridLink

215kWh ESS 194kW Output 40kW Solar

POS / Card

Payment

Travel Plaza

Site

3 months

Time to Deploy

Deployment Highlights

Oregon's First Solar Plus Storage DC Fast Charging Station

Four dual-dispenser GridLink units fed by solar array directly into the 215kWh battery. Delivering up to 194kW split dynamically between two ports per unit.

Direct PV Integration

40kW solar array integrates directly into the 215kWh energy storage via onboard Maximum Power Point Tracking (MPPT) modules. This significantly simplifies the solar integration with site build.

Demand Charge Mitigation

Significant demand charge reduction by setting site load limits during peak hours and allowing solar to fill battery to offset grid intake.

Revenue Impact and Future Operations

Solar integrated EV charging stations generate up to 8x higher revenue potential per kWh compared to traditional battery storage, demonstrating a compelling and replicable model for solar distributors and charge point operators.

C6AM Charger in front of a pink hotel building

Arrowhead Travel Plaza

Pendelton, Oregon

October 2025

XCharge North America partnered with Wildhorse Resort & Casino's Arrowhead Travel Plaza to deploy the state's first solar integrated EV charging station with four dual-dispenser GridLink units with 40kW feeding 860kWh of total battery storage, GridLink delivers up to 194kW to vehicles split dynamically between two ports.

4

GridLink

215kWh ESS 194kW Output 40kW Solar

POS / Card

Payment

Travel Plaza

Site

3 months

Time to Deploy

Deployment Highlights

Oregon's First Solar Plus Storage DC Fast Charging Station

Four dual-dispenser GridLink units fed by solar array directly into the 215kWh battery. Delivering up to 194kW split dynamically between two ports per unit.

Direct PV Integration

40kW solar array integrates directly into the 215kWh energy storage via onboard Maximum Power Point Tracking (MPPT) modules. This significantly simplifies the solar integration with site build.

Demand Charge Mitigation

Significant demand charge reduction by setting site load limits during peak hours and allowing solar to fill battery to offset grid intake.

Revenue Impact and Future Operations

Solar integrated EV charging stations generate up to 8x higher revenue potential per kWh compared to traditional battery storage, demonstrating a compelling and replicable model for solar distributors and charge point operators.

C6AM Charger in front of a pink hotel building

Arrowhead Travel Plaza

Pendelton, Oregon

October 2025

XCharge North America partnered with Wildhorse Resort & Casino's Arrowhead Travel Plaza to deploy the state's first solar integrated EV charging station with four dual-dispenser GridLink units with 40kW feeding 860kWh of total battery storage, GridLink delivers up to 194kW to vehicles split dynamically between two ports.

4

GridLink

215kWh ESS 194kW Output 40kW Solar

POS / Card

Payment

Travel Plaza

Site

3 months

Time to Deploy

Deployment Highlights

Oregon's First Solar Plus Storage DC Fast Charging Station

Four dual-dispenser GridLink units fed by solar array directly into the 215kWh battery. Delivering up to 194kW split dynamically between two ports per unit.

Direct PV Integration

40kW solar array integrates directly into the 215kWh energy storage via onboard Maximum Power Point Tracking (MPPT) modules. This significantly simplifies the solar integration with site build.

Demand Charge Mitigation

Significant demand charge reduction by setting site load limits during peak hours and allowing solar to fill battery to offset grid intake.

Revenue Impact and Future Operations

Solar integrated EV charging stations generate up to 8x higher revenue potential per kWh compared to traditional battery storage, demonstrating a compelling and replicable model for solar distributors and charge point operators.

GridLink Charging FedEx Truck at Gateway Fleets Depot

Gateway Fleets

Riverside, California

November 2024

XCharge North America partnered with Gateway Fleets to power its flagship EV depot in Southern California. Featuring four GridLink XL systems with dual 430kWh battery packs, the site delivers high-speed charging while reducing grid impact.

2

GridLink

430kWh ESS 194kW Output

RFID / NFC

Payment

Fleet Depot

Site

3 months

Time to Deploy

Deployment Highlights

Fleet Depot Electrification

Deployed 4 GridLink XL systems (dual battery configuration, 430kWh each) to enable full-site electrification for last-mile fleet operators.

Demand Charge Avoidance through Smart Charging and ESS

Intelligent energy management recharges GridLink batteries during off-peak pricing hours, dramatically reducing exposure to Southern California’s peak demand rates.

High-Impact Charging from Limited Grid

Allows consistent high-power EV charging from limited electrical infrastructure, supporting a full fleet without expensive grid upgrades.

Impact & Future Potential

– Enables 24/7 Operations at a depot where peak-hour energy pricing and demand constraints previously made high-speed charging economically infeasible.
– Showcases replicable depot model that Gateway is now designing into future locations across the country.
– Demonstrates flexibility of GridLink XL for large-scale operations with grid limitations.

GridLink Charging FedEx Truck at Gateway Fleets Depot

Gateway Fleets

Riverside, California

November 2024

XCharge North America partnered with Gateway Fleets to power its flagship EV depot in Southern California. Featuring four GridLink XL systems with dual 430kWh battery packs, the site delivers high-speed charging while reducing grid impact.

2

GridLink

430kWh ESS 194kW Output

RFID / NFC

Payment

Fleet Depot

Site

3 months

Time to Deploy

Deployment Highlights

Fleet Depot Electrification

Deployed 4 GridLink XL systems (dual battery configuration, 430kWh each) to enable full-site electrification for last-mile fleet operators.

Demand Charge Avoidance through Smart Charging and ESS

Intelligent energy management recharges GridLink batteries during off-peak pricing hours, dramatically reducing exposure to Southern California’s peak demand rates.

High-Impact Charging from Limited Grid

Allows consistent high-power EV charging from limited electrical infrastructure, supporting a full fleet without expensive grid upgrades.

Impact & Future Potential

– Enables 24/7 Operations at a depot where peak-hour energy pricing and demand constraints previously made high-speed charging economically infeasible.
– Showcases replicable depot model that Gateway is now designing into future locations across the country.
– Demonstrates flexibility of GridLink XL for large-scale operations with grid limitations.

GridLink Charging FedEx Truck at Gateway Fleets Depot

Gateway Fleets

Riverside, California

November 2024

XCharge North America partnered with Gateway Fleets to power its flagship EV depot in Southern California. Featuring four GridLink XL systems with dual 430kWh battery packs, the site delivers high-speed charging while reducing grid impact.

2

GridLink

430kWh ESS 194kW Output

RFID / NFC

Payment

Fleet Depot

Site

3 months

Time to Deploy

Deployment Highlights

Fleet Depot Electrification

Deployed 4 GridLink XL systems (dual battery configuration, 430kWh each) to enable full-site electrification for last-mile fleet operators.

Demand Charge Avoidance through Smart Charging and ESS

Intelligent energy management recharges GridLink batteries during off-peak pricing hours, dramatically reducing exposure to Southern California’s peak demand rates.

High-Impact Charging from Limited Grid

Allows consistent high-power EV charging from limited electrical infrastructure, supporting a full fleet without expensive grid upgrades.

Impact & Future Potential

– Enables 24/7 Operations at a depot where peak-hour energy pricing and demand constraints previously made high-speed charging economically infeasible.
– Showcases replicable depot model that Gateway is now designing into future locations across the country.
– Demonstrates flexibility of GridLink XL for large-scale operations with grid limitations.

C6AM Charger in front of a pink hotel building

Detroit Public Works

Detroit, Michigan

April 2025

Partnering with the Detroit Department of Public Works (DPW) to deploy the GridLink battery-integrated charging system to support the city’s transition to an electrified municipal fleet. The installation enables high-speed charging at a site with only access to onsite 208Vac 3 phase service, showcasing GridLink’s ability to adapt to infrastructure constraints while supporting light, medium, and heavy-duty EVs with sustained, high speed charging output.

1

GridLink

215kWh ESS 194kW Output 44kW 208Vac Input

RFID / NFC

Payment

Municipal

Site

3 months

Time to Deploy

Deployment Highlights

Hi-Speed Charging on Constrained Grid

Delivers up to 194kW output from just 44kW 208Vac 3 phase grid input by leveraging battery storage

Fleet-Ready Flexibility

Designed to serve light-, medium-, and heavy-duty electric vehicles with minimal noise and disruption.

Smart Load Management

High power output that can support heavy duty vehicles while setting prioritized load schedules based on time of day and utility rates.

Revenue Impact and Future Operations

– Enables charging for municipal fleets in previously non-viable locations given limited grid need and high output capabilities

– Demonstrates model for other cities aiming to electrify without major infrastructure upgrades and allowing fragmented infrastructure counter to depot infrastrcture.

– Unlocks future opportunities for B2G, load balancing, and modular fleet expansion

C6AM Charger in front of a pink hotel building

Detroit Public Works

Detroit, Michigan

April 2025

Partnering with the Detroit Department of Public Works (DPW) to deploy the GridLink battery-integrated charging system to support the city’s transition to an electrified municipal fleet. The installation enables high-speed charging at a site with only access to onsite 208Vac 3 phase service, showcasing GridLink’s ability to adapt to infrastructure constraints while supporting light, medium, and heavy-duty EVs with sustained, high speed charging output.

1

GridLink

215kWh ESS 194kW Output 44kW 208Vac Input

RFID / NFC

Payment

Municipal

Site

3 months

Time to Deploy

Deployment Highlights

Hi-Speed Charging on Constrained Grid

Delivers up to 194kW output from just 44kW 208Vac 3 phase grid input by leveraging battery storage

Fleet-Ready Flexibility

Designed to serve light-, medium-, and heavy-duty electric vehicles with minimal noise and disruption.

Smart Load Management

High power output that can support heavy duty vehicles while setting prioritized load schedules based on time of day and utility rates.

Revenue Impact and Future Operations

– Enables charging for municipal fleets in previously non-viable locations given limited grid need and high output capabilities

– Demonstrates model for other cities aiming to electrify without major infrastructure upgrades and allowing fragmented infrastructure counter to depot infrastrcture.

– Unlocks future opportunities for B2G, load balancing, and modular fleet expansion

C6AM Charger in front of a pink hotel building

Detroit Public Works

Detroit, Michigan

April 2025

Partnering with the Detroit Department of Public Works (DPW) to deploy the GridLink battery-integrated charging system to support the city’s transition to an electrified municipal fleet. The installation enables high-speed charging at a site with only access to onsite 208Vac 3 phase service, showcasing GridLink’s ability to adapt to infrastructure constraints while supporting light, medium, and heavy-duty EVs with sustained, high speed charging output.

1

GridLink

215kWh ESS 194kW Output 44kW 208Vac Input

RFID / NFC

Payment

Municipal

Site

3 months

Time to Deploy

Deployment Highlights

Hi-Speed Charging on Constrained Grid

Delivers up to 194kW output from just 44kW 208Vac 3 phase grid input by leveraging battery storage

Fleet-Ready Flexibility

Designed to serve light-, medium-, and heavy-duty electric vehicles with minimal noise and disruption.

Smart Load Management

High power output that can support heavy duty vehicles while setting prioritized load schedules based on time of day and utility rates.

Revenue Impact and Future Operations

– Enables charging for municipal fleets in previously non-viable locations given limited grid need and high output capabilities

– Demonstrates model for other cities aiming to electrify without major infrastructure upgrades and allowing fragmented infrastructure counter to depot infrastrcture.

– Unlocks future opportunities for B2G, load balancing, and modular fleet expansion

GridLink Charging FedEx Truck at Gateway Fleets Depot

Auto Dealerships

Canada (Multiple Locations)

May 2025

Over 10 units have been deployed across dealerships in Canada and the United States utilizing 215kWh energy storage combined with 44kW grid connection on 480Vac 3-phase or 208Vac 3-phase stepped up to 480Vac 3-phase. This ability to adapt to existing infrastructure and integration with battery aligns with dealership goals for electrification and future readiness.

1

GridLink

215kWh ESS 194kW Output

POS / Card

Payment

Dealership

Site

2 months

Time to Deploy

Deployment Highlights

Maximized Existing Infrastructure

Enabled high-speed DC charging from a power source originally designed for Level 2 use.

EV Infrastructure in Legacy Auto Environments

Brings 194kW EV charging to a site surrounded by traditional ICE vehicle infrastructure.

Designed for High-Visibility Public Use

GridLink serves both dealership visitors and general EV drivers with easy access - with its 55-inch touch screen, dealerships can maximize impact for customers.

Impact & Future Potential

– Sets the foundation for large-scale electrification across dealer groups and retail hubs

-Creates a model for businesses with limited electrical capacity.

Offers seamless EV customer experience and positions dealerships as a leaders and educators in EV Charging

GridLink Charging FedEx Truck at Gateway Fleets Depot

Auto Dealerships

Canada (Multiple Locations)

May 2025

Over 10 units have been deployed across dealerships in Canada and the United States utilizing 215kWh energy storage combined with 44kW grid connection on 480Vac 3-phase or 208Vac 3-phase stepped up to 480Vac 3-phase. This ability to adapt to existing infrastructure and integration with battery aligns with dealership goals for electrification and future readiness.

1

GridLink

215kWh ESS 194kW Output

POS / Card

Payment

Dealership

Site

2 months

Time to Deploy

Deployment Highlights

Maximized Existing Infrastructure

Enabled high-speed DC charging from a power source originally designed for Level 2 use.

EV Infrastructure in Legacy Auto Environments

Brings 194kW EV charging to a site surrounded by traditional ICE vehicle infrastructure.

Designed for High-Visibility Public Use

GridLink serves both dealership visitors and general EV drivers with easy access - with its 55-inch touch screen, dealerships can maximize impact for customers.

Impact & Future Potential

– Sets the foundation for large-scale electrification across dealer groups and retail hubs

-Creates a model for businesses with limited electrical capacity.

Offers seamless EV customer experience and positions dealerships as a leaders and educators in EV Charging

GridLink Charging FedEx Truck at Gateway Fleets Depot

Auto Dealerships

Canada (Multiple Locations)

May 2025

Over 10 units have been deployed across dealerships in Canada and the United States utilizing 215kWh energy storage combined with 44kW grid connection on 480Vac 3-phase or 208Vac 3-phase stepped up to 480Vac 3-phase. This ability to adapt to existing infrastructure and integration with battery aligns with dealership goals for electrification and future readiness.

1

GridLink

215kWh ESS 194kW Output

POS / Card

Payment

Dealership

Site

2 months

Time to Deploy

Deployment Highlights

Maximized Existing Infrastructure

Enabled high-speed DC charging from a power source originally designed for Level 2 use.

EV Infrastructure in Legacy Auto Environments

Brings 194kW EV charging to a site surrounded by traditional ICE vehicle infrastructure.

Designed for High-Visibility Public Use

GridLink serves both dealership visitors and general EV drivers with easy access - with its 55-inch touch screen, dealerships can maximize impact for customers.

Impact & Future Potential

– Sets the foundation for large-scale electrification across dealer groups and retail hubs

-Creates a model for businesses with limited electrical capacity.

Offers seamless EV customer experience and positions dealerships as a leaders and educators in EV Charging

C6AM Charger in front of a pink hotel building

Cellerate Power

Winhall, Vermont

October 2025

Installing the state's first 400kW charging units and at the time the fastest, Erik Moses of Cellerate Power saw an opportunity near Stratton Resort to offer charging to skiing tourists and summer holiday travelers in a rural region and accomplished that mission with peak reliability in mind.

2

C7

400kW NACS/CCS1

POS / Card

Payment

Tourism/CPO

Site

4 months

Time to Deploy

Deployment Highlights

Vermont's Fastest & North America's First C7 Deployment

Delivers up to 400kW output for a site total of 800kW from two C7AMs, the first of its kind in Vermont.

Universal Connector Compatibility

Each charger features one CCS1 and one NACS (SAE J3400) port with dynamic power allocation at 40kW granularity, enabling simultaneous charging for virtually all registered EV models across four total ports.

Critical Infrastructure Gap Filled

Prior to this installation, the nearest fast-charging alternative was 30 minutes away and limited to 150kW for CCS-only vehicles. The Winhall site eliminates this gap for both local residents and seasonal visitors.

Impact & Future Operations

Combats EV Range Anxiety in a state where cold winters and mountainous terrain significantly reduce battery range and efficiency, making high-speed charging a necessity rather than a convenience.

Drives Economic Development for the Stratton Mountain area by attracting EV-driving visitors and increasing foot traffic to nearby businesses, supported by 21.5-inch interactive screens promoting local commerce.

Replicable Model for Rural & Resort Markets — Cellerate Power plans to expand its Vermont charging network, positioning this deployment as the blueprint for bringing ultra-fast charging to underserved, high-traffic tourist destinations.

C6AM Charger in front of a pink hotel building

Cellerate Power

Winhall, Vermont

October 2025

Installing the state's first 400kW charging units and at the time the fastest, Erik Moses of Cellerate Power saw an opportunity near Stratton Resort to offer charging to skiing tourists and summer holiday travelers in a rural region and accomplished that mission with peak reliability in mind.

2

C7

400kW NACS/CCS1

POS / Card

Payment

Tourism/CPO

Site

4 months

Time to Deploy

Deployment Highlights

Vermont's Fastest & North America's First C7 Deployment

Delivers up to 400kW output for a site total of 800kW from two C7AMs, the first of its kind in Vermont.

Universal Connector Compatibility

Each charger features one CCS1 and one NACS (SAE J3400) port with dynamic power allocation at 40kW granularity, enabling simultaneous charging for virtually all registered EV models across four total ports.

Critical Infrastructure Gap Filled

Prior to this installation, the nearest fast-charging alternative was 30 minutes away and limited to 150kW for CCS-only vehicles. The Winhall site eliminates this gap for both local residents and seasonal visitors.

Impact & Future Operations

Combats EV Range Anxiety in a state where cold winters and mountainous terrain significantly reduce battery range and efficiency, making high-speed charging a necessity rather than a convenience.

Drives Economic Development for the Stratton Mountain area by attracting EV-driving visitors and increasing foot traffic to nearby businesses, supported by 21.5-inch interactive screens promoting local commerce.

Replicable Model for Rural & Resort Markets — Cellerate Power plans to expand its Vermont charging network, positioning this deployment as the blueprint for bringing ultra-fast charging to underserved, high-traffic tourist destinations.

C6AM Charger in front of a pink hotel building

Cellerate Power

Winhall, Vermont

October 2025

Installing the state's first 400kW charging units and at the time the fastest, Erik Moses of Cellerate Power saw an opportunity near Stratton Resort to offer charging to skiing tourists and summer holiday travelers in a rural region and accomplished that mission with peak reliability in mind.

2

C7

400kW NACS/CCS1

POS / Card

Payment

Tourism/CPO

Site

4 months

Time to Deploy

Deployment Highlights

Vermont's Fastest & North America's First C7 Deployment

Delivers up to 400kW output for a site total of 800kW from two C7AMs, the first of its kind in Vermont.

Universal Connector Compatibility

Each charger features one CCS1 and one NACS (SAE J3400) port with dynamic power allocation at 40kW granularity, enabling simultaneous charging for virtually all registered EV models across four total ports.

Critical Infrastructure Gap Filled

Prior to this installation, the nearest fast-charging alternative was 30 minutes away and limited to 150kW for CCS-only vehicles. The Winhall site eliminates this gap for both local residents and seasonal visitors.

Impact & Future Operations

Combats EV Range Anxiety in a state where cold winters and mountainous terrain significantly reduce battery range and efficiency, making high-speed charging a necessity rather than a convenience.

Drives Economic Development for the Stratton Mountain area by attracting EV-driving visitors and increasing foot traffic to nearby businesses, supported by 21.5-inch interactive screens promoting local commerce.

Replicable Model for Rural & Resort Markets — Cellerate Power plans to expand its Vermont charging network, positioning this deployment as the blueprint for bringing ultra-fast charging to underserved, high-traffic tourist destinations.

Battery Integrated Charger with Solar Panels

Orlando Utility Commission

Orlando, Florida

November 2024

XCharge North America partnered with the Orlando Utilities Commission (OUC) to deploy the Net Zero Series charger at OUC’s Grid Integration Laboratory (GIL). This project explores how battery-integrated EV charging can enhance grid stability, reduce infrastructure costs, and support microgrid applications.

1

NZS

189kW / 480Vac

RFID / NFC

Payment

Utility

Site

3 months

Time to Deploy

Deployment Highlights

Peak Demand Reduction

NZS lowers grid draw by up to 75 percent, easing strain on utilities

High-Power Output

Operates on a 60-amp breaker, delivering up to 189 kW for rapid charging

Bidirectional Energy Capabilities

Supports backup power and micro-grid applications

Impact & Future Potential

Reduced upgrade costs enables high-speed charging on existing infrastructure. Grid stability improvements provides demand response support during peak usage. Scalability for future deployments helps integrate renewable energy and emergency backup power.

Battery Integrated Charger with Solar Panels

Orlando Utility Commission

Orlando, Florida

November 2024

XCharge North America partnered with the Orlando Utilities Commission (OUC) to deploy the Net Zero Series charger at OUC’s Grid Integration Laboratory (GIL). This project explores how battery-integrated EV charging can enhance grid stability, reduce infrastructure costs, and support microgrid applications.

1

NZS

189kW / 480Vac

RFID / NFC

Payment

Utility

Site

3 months

Time to Deploy

Deployment Highlights

Peak Demand Reduction

NZS lowers grid draw by up to 75 percent, easing strain on utilities

High-Power Output

Operates on a 60-amp breaker, delivering up to 189 kW for rapid charging

Bidirectional Energy Capabilities

Supports backup power and micro-grid applications

Impact & Future Potential

Reduced upgrade costs enables high-speed charging on existing infrastructure. Grid stability improvements provides demand response support during peak usage. Scalability for future deployments helps integrate renewable energy and emergency backup power.

Battery Integrated Charger with Solar Panels

Orlando Utility Commission

Orlando, Florida

November 2024

XCharge North America partnered with the Orlando Utilities Commission (OUC) to deploy the Net Zero Series charger at OUC’s Grid Integration Laboratory (GIL). This project explores how battery-integrated EV charging can enhance grid stability, reduce infrastructure costs, and support microgrid applications.

1

NZS

189kW / 480Vac

RFID / NFC

Payment

Utility

Site

3 months

Time to Deploy

Deployment Highlights

Peak Demand Reduction

NZS lowers grid draw by up to 75 percent, easing strain on utilities

High-Power Output

Operates on a 60-amp breaker, delivering up to 189 kW for rapid charging

Bidirectional Energy Capabilities

Supports backup power and micro-grid applications

Impact & Future Potential

Reduced upgrade costs enables high-speed charging on existing infrastructure. Grid stability improvements provides demand response support during peak usage. Scalability for future deployments helps integrate renewable energy and emergency backup power.

C6AM Charger in a parking lot with trees and buildings behind

Town of Middleburg

Middleburg, Virginia

March 2024

XCharge partnered with the Town of Middleburg, Virginia, to deploy its first DC fast charger at Middleburg Town Hall as part of a pilot program with the Virginia Clean Cities Coalition. The municipality sought to provide a convenient, safe charging option for residents while exploring new revenue streams for the town.

1

C6AM

150kW / 480Vac

POS / Card

Payment

Municipality

Site

6 months

Time to Deploy

Deployment Highlights

Public-Private Partnership

Municipality covered installation, XCharge provided the charger under a revenue-sharing model

Charger Utilization

181 charging sessions logged, delivering 3,806.99 kWh of energy

Community Engagement

Scalability & Future Growth

While no immediate expansion plans exist for this municipality, the project serves as a model for other towns integrating EV infrastructure.

C6AM Charger in a parking lot with trees and buildings behind

Town of Middleburg

Middleburg, Virginia

March 2024

XCharge partnered with the Town of Middleburg, Virginia, to deploy its first DC fast charger at Middleburg Town Hall as part of a pilot program with the Virginia Clean Cities Coalition. The municipality sought to provide a convenient, safe charging option for residents while exploring new revenue streams for the town.

1

C6AM

150kW / 480Vac

POS / Card

Payment

Municipality

Site

6 months

Time to Deploy

Deployment Highlights

Public-Private Partnership

Municipality covered installation, XCharge provided the charger under a revenue-sharing model

Charger Utilization

181 charging sessions logged, delivering 3,806.99 kWh of energy

Community Engagement

Scalability & Future Growth

While no immediate expansion plans exist for this municipality, the project serves as a model for other towns integrating EV infrastructure.

C6AM Charger in a parking lot with trees and buildings behind

Town of Middleburg

Middleburg, Virginia

March 2024

XCharge partnered with the Town of Middleburg, Virginia, to deploy its first DC fast charger at Middleburg Town Hall as part of a pilot program with the Virginia Clean Cities Coalition. The municipality sought to provide a convenient, safe charging option for residents while exploring new revenue streams for the town.

1

C6AM

150kW / 480Vac

POS / Card

Payment

Municipality

Site

6 months

Time to Deploy

Deployment Highlights

Public-Private Partnership

Municipality covered installation, XCharge provided the charger under a revenue-sharing model

Charger Utilization

181 charging sessions logged, delivering 3,806.99 kWh of energy

Community Engagement

Scalability & Future Growth

While no immediate expansion plans exist for this municipality, the project serves as a model for other towns integrating EV infrastructure.

C6AM chargers in a parking lot with a view of las vegas

Kaptyn

Las Vegas, Nevada

May 2024

Kaptyn, a leader in luxury ride-hailing services, needed a scalable fast-charging solution for its high-utilization EV fleet. Their 208V system had a total power capacity of 200kW, creating operational constraints as their fleet expanded.

4

C6AM

Combination

POS / Card

Payment

Parking Lot

Site

3 months

Time to Deploy

Deployment Highlights

Multi-Charger Integration

Three C6AM chargers on 208V, intelligently distributing power across six ports

High-Speed Charging for Quick Turnarounds

One C6AM on 480V, delivering up to 150kW for vehicles needing fast charging

Optimized Energy Management

Intelligent load balancing ensures site power capacity isn't exceeded

Business Impact

Simultaneous charging for up to eight vehicles, reduced downtime & improved fleet availability, and future scalability without significant infrastructure upgrades. By combining 208V load-controlled charging with a 480V fast-charging option, Kaptyn optimized its EV fleet efficiency while keeping infrastructure costs low.

C6AM chargers in a parking lot with a view of las vegas

Kaptyn

Las Vegas, Nevada

May 2024

Kaptyn, a leader in luxury ride-hailing services, needed a scalable fast-charging solution for its high-utilization EV fleet. Their 208V system had a total power capacity of 200kW, creating operational constraints as their fleet expanded.

4

C6AM

Combination

POS / Card

Payment

Parking Lot

Site

3 months

Time to Deploy

Deployment Highlights

Multi-Charger Integration

Three C6AM chargers on 208V, intelligently distributing power across six ports

High-Speed Charging for Quick Turnarounds

One C6AM on 480V, delivering up to 150kW for vehicles needing fast charging

Optimized Energy Management

Intelligent load balancing ensures site power capacity isn't exceeded

Business Impact

Simultaneous charging for up to eight vehicles, reduced downtime & improved fleet availability, and future scalability without significant infrastructure upgrades. By combining 208V load-controlled charging with a 480V fast-charging option, Kaptyn optimized its EV fleet efficiency while keeping infrastructure costs low.

C6AM chargers in a parking lot with a view of las vegas

Kaptyn

Las Vegas, Nevada

May 2024

Kaptyn, a leader in luxury ride-hailing services, needed a scalable fast-charging solution for its high-utilization EV fleet. Their 208V system had a total power capacity of 200kW, creating operational constraints as their fleet expanded.

4

C6AM

Combination

POS / Card

Payment

Parking Lot

Site

3 months

Time to Deploy

Deployment Highlights

Multi-Charger Integration

Three C6AM chargers on 208V, intelligently distributing power across six ports

High-Speed Charging for Quick Turnarounds

One C6AM on 480V, delivering up to 150kW for vehicles needing fast charging

Optimized Energy Management

Intelligent load balancing ensures site power capacity isn't exceeded

Business Impact

Simultaneous charging for up to eight vehicles, reduced downtime & improved fleet availability, and future scalability without significant infrastructure upgrades. By combining 208V load-controlled charging with a 480V fast-charging option, Kaptyn optimized its EV fleet efficiency while keeping infrastructure costs low.

C6AM Charge with a blue hood in a parking garage with windows

Charge Point Operator

Myrtle Beach, South Carolina

October 2023

An operator of primarily Level 2 charging solutions, sought a cost-effective, flexible fast charger for a hotel parking garage. The C6AM charger was installed on 208V power, demonstrating how DC fast charging can be seamlessly integrated into existing infrastructure.

1

C6AM

95kW / 208Vac

QR Code

Payment

Hotel

Site

4 months

Time to Deploy

Deployment Highlights

Faster Charging in Hospitality

Higher-value DC fast charging compared to typical Level 2 setups

Flexibility in Power Requirements

C6AM installed at 208V, showcasing versatility for varied infrastructure

Full Integration with CPO Backend

Seamless communication via custom OCPP backend

Business Impact

This deployment proves the profitability of DC fast charging in hospitality, enabling higher revenue potential than Level 2 alternatives. 

C6AM Charge with a blue hood in a parking garage with windows

Charge Point Operator

Myrtle Beach, South Carolina

October 2023

An operator of primarily Level 2 charging solutions, sought a cost-effective, flexible fast charger for a hotel parking garage. The C6AM charger was installed on 208V power, demonstrating how DC fast charging can be seamlessly integrated into existing infrastructure.

1

C6AM

95kW / 208Vac

QR Code

Payment

Hotel

Site

4 months

Time to Deploy

Deployment Highlights

Faster Charging in Hospitality

Higher-value DC fast charging compared to typical Level 2 setups

Flexibility in Power Requirements

C6AM installed at 208V, showcasing versatility for varied infrastructure

Full Integration with CPO Backend

Seamless communication via custom OCPP backend

Business Impact

This deployment proves the profitability of DC fast charging in hospitality, enabling higher revenue potential than Level 2 alternatives. 

C6AM Charge with a blue hood in a parking garage with windows

Charge Point Operator

Myrtle Beach, South Carolina

October 2023

An operator of primarily Level 2 charging solutions, sought a cost-effective, flexible fast charger for a hotel parking garage. The C6AM charger was installed on 208V power, demonstrating how DC fast charging can be seamlessly integrated into existing infrastructure.

1

C6AM

95kW / 208Vac

QR Code

Payment

Hotel

Site

4 months

Time to Deploy

Deployment Highlights

Faster Charging in Hospitality

Higher-value DC fast charging compared to typical Level 2 setups

Flexibility in Power Requirements

C6AM installed at 208V, showcasing versatility for varied infrastructure

Full Integration with CPO Backend

Seamless communication via custom OCPP backend

Business Impact

This deployment proves the profitability of DC fast charging in hospitality, enabling higher revenue potential than Level 2 alternatives. 

Two C6AM chargers in a parking lot next to a CITGO sign

CITGO Gas Station

Michigan

January 2024

In collaboration with AGI and Folk Oil Company, XCharge deployed the first DC fast charger at a Citgo station nationwide. The C6AM charger was selected for its ease of installation, power flexibility, and proven cold-weather performance.

2

C6AM

150kW / 480Vac

POS / Card

Payment

Gas Station

Site

6 months

Time to Deploy

Deployment Highlights

Overcoming Gas Station Challenges

Installed without disrupting underground fuel lines

Charging Speed & Customer Impact

150kW dual-port DC fast charging, reducing charge times to 20-45 minutes

Retail Benefits

Increased foot traffic and ancillary sales at the convenience store

Future Expansion

Through our charge point operator partner, additional fuel retailer locations are being evaluated for deployment.

Two C6AM chargers in a parking lot next to a CITGO sign

CITGO Gas Station

Michigan

January 2024

In collaboration with AGI and Folk Oil Company, XCharge deployed the first DC fast charger at a Citgo station nationwide. The C6AM charger was selected for its ease of installation, power flexibility, and proven cold-weather performance.

2

C6AM

150kW / 480Vac

POS / Card

Payment

Gas Station

Site

6 months

Time to Deploy

Deployment Highlights

Overcoming Gas Station Challenges

Installed without disrupting underground fuel lines

Charging Speed & Customer Impact

150kW dual-port DC fast charging, reducing charge times to 20-45 minutes

Retail Benefits

Increased foot traffic and ancillary sales at the convenience store

Future Expansion

Through our charge point operator partner, additional fuel retailer locations are being evaluated for deployment.

Two C6AM chargers in a parking lot next to a CITGO sign

CITGO Gas Station

Michigan

January 2024

In collaboration with AGI and Folk Oil Company, XCharge deployed the first DC fast charger at a Citgo station nationwide. The C6AM charger was selected for its ease of installation, power flexibility, and proven cold-weather performance.

2

C6AM

150kW / 480Vac

POS / Card

Payment

Gas Station

Site

6 months

Time to Deploy

Deployment Highlights

Overcoming Gas Station Challenges

Installed without disrupting underground fuel lines

Charging Speed & Customer Impact

150kW dual-port DC fast charging, reducing charge times to 20-45 minutes

Retail Benefits

Increased foot traffic and ancillary sales at the convenience store

Future Expansion

Through our charge point operator partner, additional fuel retailer locations are being evaluated for deployment.

C6AM charger in front of a building

Dock Quick Stop

New Orleans, Louisiana

August 2023

With no public incentives for DC fast charging in the state, Dock Quick Stop’s owner recognized the untapped revenue potential of installing a C6 fast charger.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Gas Station

Site

2 months

Time to Deploy

Deployment Highlights

Optimized for Existing Infrastructure

Scaled charger from 30kW to 62.5kW

High Utilization

3+ charging sessions per day, driving additional store traffic

Strategic Location for Rideshare

Popular among TNC & Uber drivers

Revenue & Expansion Potential

With near full ROI within a year, the owner is considering additional charger installations at other properties.

C6AM charger in front of a building

Dock Quick Stop

New Orleans, Louisiana

August 2023

With no public incentives for DC fast charging in the state, Dock Quick Stop’s owner recognized the untapped revenue potential of installing a C6 fast charger.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Gas Station

Site

2 months

Time to Deploy

Deployment Highlights

Optimized for Existing Infrastructure

Scaled charger from 30kW to 62.5kW

High Utilization

3+ charging sessions per day, driving additional store traffic

Strategic Location for Rideshare

Popular among TNC & Uber drivers

Revenue & Expansion Potential

With near full ROI within a year, the owner is considering additional charger installations at other properties.

C6AM charger in front of a building

Dock Quick Stop

New Orleans, Louisiana

August 2023

With no public incentives for DC fast charging in the state, Dock Quick Stop’s owner recognized the untapped revenue potential of installing a C6 fast charger.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Gas Station

Site

2 months

Time to Deploy

Deployment Highlights

Optimized for Existing Infrastructure

Scaled charger from 30kW to 62.5kW

High Utilization

3+ charging sessions per day, driving additional store traffic

Strategic Location for Rideshare

Popular among TNC & Uber drivers

Revenue & Expansion Potential

With near full ROI within a year, the owner is considering additional charger installations at other properties.

C6AM on a lot at night with two cars next to it

Airport Rental Fleet

LGA, JFK, MCO, RDU Airports

October 2023

Before XCharge, this rental fleet provider relied on Level 2 chargers, requiring 6+ hours per charge. This led to off-site charging, increased operational costs, and delayed vehicle turnover.

7

C6AM

Combination

RFID / NFC

Payment

Airport Car Rental

Site

2 months

Time to Deploy

Deployment Highlights

Infrastructure Adaptability

Seven C6AM chargers installed across six airports, utilizing both 208V and 480V power for cost-effective deployment

Fleet Turnover Acceleration

Charge times reduced from 6+ hours to 30 minutes, increasing vehicle turnover by 10x

Eliminated Off-Site Charging

Reduced operational costs & porter liability

Future Expansion

With proven success, additional locations are in the pipeline, leveraging C6AM’s adaptability for scalable fleet electrification.

C6AM on a lot at night with two cars next to it

Airport Rental Fleet

LGA, JFK, MCO, RDU Airports

October 2023

Before XCharge, this rental fleet provider relied on Level 2 chargers, requiring 6+ hours per charge. This led to off-site charging, increased operational costs, and delayed vehicle turnover.

7

C6AM

Combination

RFID / NFC

Payment

Airport Car Rental

Site

2 months

Time to Deploy

Deployment Highlights

Infrastructure Adaptability

Seven C6AM chargers installed across six airports, utilizing both 208V and 480V power for cost-effective deployment

Fleet Turnover Acceleration

Charge times reduced from 6+ hours to 30 minutes, increasing vehicle turnover by 10x

Eliminated Off-Site Charging

Reduced operational costs & porter liability

Future Expansion

With proven success, additional locations are in the pipeline, leveraging C6AM’s adaptability for scalable fleet electrification.

C6AM on a lot at night with two cars next to it

Airport Rental Fleet

LGA, JFK, MCO, RDU Airports

October 2023

Before XCharge, this rental fleet provider relied on Level 2 chargers, requiring 6+ hours per charge. This led to off-site charging, increased operational costs, and delayed vehicle turnover.

7

C6AM

Combination

RFID / NFC

Payment

Airport Car Rental

Site

2 months

Time to Deploy

Deployment Highlights

Infrastructure Adaptability

Seven C6AM chargers installed across six airports, utilizing both 208V and 480V power for cost-effective deployment

Fleet Turnover Acceleration

Charge times reduced from 6+ hours to 30 minutes, increasing vehicle turnover by 10x

Eliminated Off-Site Charging

Reduced operational costs & porter liability

Future Expansion

With proven success, additional locations are in the pipeline, leveraging C6AM’s adaptability for scalable fleet electrification.

C6AM Charger in front of a pink hotel building

Hotel Wingate by Wyndham

Tinley Park, Illinois

November 2022

The first U.S. deployment of XCharge, this hotel-based DC fast charger utilized existing 208V power, cutting installation costs by over 90 percent.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Hotel

Site

3 months

Time to Deploy

Deployment Highlights

Cost-Effective Installation

Total install cost only $5,000

Higher Revenue Potential

DC fast charging generates 20x more revenue than Level 2 alternatives

Strategic Location

Located near major transportation corridors

Future Expansion

The hotel owner is evaluating additional charger installations at other properties.

C6AM Charger in front of a pink hotel building

Hotel Wingate by Wyndham

Tinley Park, Illinois

November 2022

The first U.S. deployment of XCharge, this hotel-based DC fast charger utilized existing 208V power, cutting installation costs by over 90 percent.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Hotel

Site

3 months

Time to Deploy

Deployment Highlights

Cost-Effective Installation

Total install cost only $5,000

Higher Revenue Potential

DC fast charging generates 20x more revenue than Level 2 alternatives

Strategic Location

Located near major transportation corridors

Future Expansion

The hotel owner is evaluating additional charger installations at other properties.

C6AM Charger in front of a pink hotel building

Hotel Wingate by Wyndham

Tinley Park, Illinois

November 2022

The first U.S. deployment of XCharge, this hotel-based DC fast charger utilized existing 208V power, cutting installation costs by over 90 percent.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Hotel

Site

3 months

Time to Deploy

Deployment Highlights

Cost-Effective Installation

Total install cost only $5,000

Higher Revenue Potential

DC fast charging generates 20x more revenue than Level 2 alternatives

Strategic Location

Located near major transportation corridors

Future Expansion

The hotel owner is evaluating additional charger installations at other properties.