Case Studies

Kaptyn
Las Vegas, Nevada
May 2024
Kaptyn, a leader in luxury ride-hailing services, needed a scalable fast-charging solution for its high-utilization EV fleet. Their 208V system had a total power capacity of 200kW, creating operational constraints as their fleet expanded.
4
C6AM
Combination
POS / Card
Payment
Parking Lot
Site
3 months
Time to Deploy
Deployment Highlights
Multi-Charger Integration
Three C6AM chargers on 208V, intelligently distributing power across six ports
High-Speed Charging for Quick Turnarounds
One C6AM on 480V, delivering up to 150kW for vehicles needing fast charging
Optimized Energy Management
Intelligent load balancing ensures site power capacity isn't exceeded
Business Impact
Simultaneous charging for up to seven vehicles, reduced downtime & improved fleet availability, and future scalability without significant infrastructure upgrades. By combining 208V load-controlled charging with a 480V fast-charging option, Kaptyn optimized its EV fleet efficiency while keeping infrastructure costs low.

Kaptyn
Las Vegas, Nevada
May 2024
Kaptyn, a leader in luxury ride-hailing services, needed a scalable fast-charging solution for its high-utilization EV fleet. Their 208V system had a total power capacity of 200kW, creating operational constraints as their fleet expanded.
4
C6AM
Combination
POS / Card
Payment
Parking Lot
Site
3 months
Time to Deploy
Deployment Highlights
Multi-Charger Integration
Three C6AM chargers on 208V, intelligently distributing power across six ports
High-Speed Charging for Quick Turnarounds
One C6AM on 480V, delivering up to 150kW for vehicles needing fast charging
Optimized Energy Management
Intelligent load balancing ensures site power capacity isn't exceeded
Business Impact
Simultaneous charging for up to seven vehicles, reduced downtime & improved fleet availability, and future scalability without significant infrastructure upgrades. By combining 208V load-controlled charging with a 480V fast-charging option, Kaptyn optimized its EV fleet efficiency while keeping infrastructure costs low.

Kaptyn
Las Vegas, Nevada
May 2024
Kaptyn, a leader in luxury ride-hailing services, needed a scalable fast-charging solution for its high-utilization EV fleet. Their 208V system had a total power capacity of 200kW, creating operational constraints as their fleet expanded.
4
C6AM
Combination
POS / Card
Payment
Parking Lot
Site
3 months
Time to Deploy
Deployment Highlights
Multi-Charger Integration
Three C6AM chargers on 208V, intelligently distributing power across six ports
High-Speed Charging for Quick Turnarounds
One C6AM on 480V, delivering up to 150kW for vehicles needing fast charging
Optimized Energy Management
Intelligent load balancing ensures site power capacity isn't exceeded
Business Impact
Simultaneous charging for up to seven vehicles, reduced downtime & improved fleet availability, and future scalability without significant infrastructure upgrades. By combining 208V load-controlled charging with a 480V fast-charging option, Kaptyn optimized its EV fleet efficiency while keeping infrastructure costs low.

Town of Middleburg
Middleburg, Virginia
March 2024
XCharge partnered with the Town of Middleburg, Virginia, to deploy its first DC fast charger at Middleburg Town Hall as part of a pilot program with the Virginia Clean Cities Coalition. The municipality sought to provide a convenient, safe charging option for residents while exploring new revenue streams for the town.
1
C6AM
150kW / 480Vac
POS / Card
Payment
Municipality
Site
6 months
Time to Deploy
Deployment Highlights
Public-Private Partnership
Municipality covered installation, XCharge provided the charger under a revenue-sharing model
Charger Utilization
181 charging sessions logged, delivering 3,806.99 kWh of energy
Community Engagement
Promoted via a joint press release with Clean Cities
Scalability & Future Growth
While no immediate expansion plans exist for this municipality, the project serves as a model for other towns integrating EV infrastructure.

Town of Middleburg
Middleburg, Virginia
March 2024
XCharge partnered with the Town of Middleburg, Virginia, to deploy its first DC fast charger at Middleburg Town Hall as part of a pilot program with the Virginia Clean Cities Coalition. The municipality sought to provide a convenient, safe charging option for residents while exploring new revenue streams for the town.
1
C6AM
150kW / 480Vac
POS / Card
Payment
Municipality
Site
6 months
Time to Deploy
Deployment Highlights
Public-Private Partnership
Municipality covered installation, XCharge provided the charger under a revenue-sharing model
Charger Utilization
181 charging sessions logged, delivering 3,806.99 kWh of energy
Community Engagement
Promoted via a joint press release with Clean Cities
Scalability & Future Growth
While no immediate expansion plans exist for this municipality, the project serves as a model for other towns integrating EV infrastructure.

Town of Middleburg
Middleburg, Virginia
March 2024
XCharge partnered with the Town of Middleburg, Virginia, to deploy its first DC fast charger at Middleburg Town Hall as part of a pilot program with the Virginia Clean Cities Coalition. The municipality sought to provide a convenient, safe charging option for residents while exploring new revenue streams for the town.
1
C6AM
150kW / 480Vac
POS / Card
Payment
Municipality
Site
6 months
Time to Deploy
Deployment Highlights
Public-Private Partnership
Municipality covered installation, XCharge provided the charger under a revenue-sharing model
Charger Utilization
181 charging sessions logged, delivering 3,806.99 kWh of energy
Community Engagement
Promoted via a joint press release with Clean Cities
Scalability & Future Growth
While no immediate expansion plans exist for this municipality, the project serves as a model for other towns integrating EV infrastructure.

CITGO Gas Station
Michigan
January 2024
In collaboration with AGI and Folk Oil Company, XCharge deployed the first DC fast charger at a Citgo station nationwide. The C6AM charger was selected for its ease of installation, power flexibility, and proven cold-weather performance.
2
C6AM
150kW / 480Vac
POS / Card
Payment
Gas Station
Site
6 months
Time to Deploy
Deployment Highlights
Overcoming Gas Station Challenges
Installed without disrupting underground fuel lines
Charging Speed & Customer Impact
150kW dual-port DC fast charging, reducing charge times to 20-45 minutes
Retail Benefits
Increased foot traffic and ancillary sales at the convenience store
Future Expansion
Through our charge point operator partner, additional fuel retailer locations are being evaluated for deployment.

CITGO Gas Station
Michigan
January 2024
In collaboration with AGI and Folk Oil Company, XCharge deployed the first DC fast charger at a Citgo station nationwide. The C6AM charger was selected for its ease of installation, power flexibility, and proven cold-weather performance.
2
C6AM
150kW / 480Vac
POS / Card
Payment
Gas Station
Site
6 months
Time to Deploy
Deployment Highlights
Overcoming Gas Station Challenges
Installed without disrupting underground fuel lines
Charging Speed & Customer Impact
150kW dual-port DC fast charging, reducing charge times to 20-45 minutes
Retail Benefits
Increased foot traffic and ancillary sales at the convenience store
Future Expansion
Through our charge point operator partner, additional fuel retailer locations are being evaluated for deployment.

CITGO Gas Station
Michigan
January 2024
In collaboration with AGI and Folk Oil Company, XCharge deployed the first DC fast charger at a Citgo station nationwide. The C6AM charger was selected for its ease of installation, power flexibility, and proven cold-weather performance.
2
C6AM
150kW / 480Vac
POS / Card
Payment
Gas Station
Site
6 months
Time to Deploy
Deployment Highlights
Overcoming Gas Station Challenges
Installed without disrupting underground fuel lines
Charging Speed & Customer Impact
150kW dual-port DC fast charging, reducing charge times to 20-45 minutes
Retail Benefits
Increased foot traffic and ancillary sales at the convenience store
Future Expansion
Through our charge point operator partner, additional fuel retailer locations are being evaluated for deployment.

Charge Point Operator
Myrtle Beach, South Carolina
October 2023
An operator of primarily Level 2 charging solutions, sought a cost-effective, flexible fast charger for a hotel parking garage. The C6AM charger was installed on 208V power, demonstrating how DC fast charging can be seamlessly integrated into existing infrastructure.
1
C6AM
95kW / 208Vac
QR Code
Payment
Hotel
Site
4 months
Time to Deploy
Deployment Highlights
Faster Charging in Hospitality
Higher-value DC fast charging compared to typical Level 2 setups
Flexibility in Power Requirements
C6AM installed at 208V, showcasing versatility for varied infrastructure
Full Integration with CPO Backend
Seamless communication via custom OCPP backend
Business Impact
This deployment proves the profitability of DC fast charging in hospitality, enabling higher revenue potential than Level 2 alternatives.

Charge Point Operator
Myrtle Beach, South Carolina
October 2023
An operator of primarily Level 2 charging solutions, sought a cost-effective, flexible fast charger for a hotel parking garage. The C6AM charger was installed on 208V power, demonstrating how DC fast charging can be seamlessly integrated into existing infrastructure.
1
C6AM
95kW / 208Vac
QR Code
Payment
Hotel
Site
4 months
Time to Deploy
Deployment Highlights
Faster Charging in Hospitality
Higher-value DC fast charging compared to typical Level 2 setups
Flexibility in Power Requirements
C6AM installed at 208V, showcasing versatility for varied infrastructure
Full Integration with CPO Backend
Seamless communication via custom OCPP backend
Business Impact
This deployment proves the profitability of DC fast charging in hospitality, enabling higher revenue potential than Level 2 alternatives.

Charge Point Operator
Myrtle Beach, South Carolina
October 2023
An operator of primarily Level 2 charging solutions, sought a cost-effective, flexible fast charger for a hotel parking garage. The C6AM charger was installed on 208V power, demonstrating how DC fast charging can be seamlessly integrated into existing infrastructure.
1
C6AM
95kW / 208Vac
QR Code
Payment
Hotel
Site
4 months
Time to Deploy
Deployment Highlights
Faster Charging in Hospitality
Higher-value DC fast charging compared to typical Level 2 setups
Flexibility in Power Requirements
C6AM installed at 208V, showcasing versatility for varied infrastructure
Full Integration with CPO Backend
Seamless communication via custom OCPP backend
Business Impact
This deployment proves the profitability of DC fast charging in hospitality, enabling higher revenue potential than Level 2 alternatives.

Airport Rental Fleet
LGA, JFK, MCO, RDU Airports
October 2023
Before XCharge, this rental fleet provider relied on Level 2 chargers, requiring 6+ hours per charge. This led to off-site charging, increased operational costs, and delayed vehicle turnover.
7
C6AM
Combination
RFID / NFC
Payment
Airport Car Rental
Site
2 months
Time to Deploy
Deployment Highlights
Infrastructure Adaptability
Seven C6AM chargers installed across six airports, utilizing both 208V and 480V power for cost-effective deployment
Fleet Turnover Acceleration
Charge times reduced from 6+ hours to 30 minutes, increasing vehicle turnover by 10x
Eliminated Off-Site Charging
Reduced operational costs & porter liability
Future Expansion
With proven success, additional locations are in the pipeline, leveraging C6AM’s adaptability for scalable fleet electrification.

Airport Rental Fleet
LGA, JFK, MCO, RDU Airports
October 2023
Before XCharge, this rental fleet provider relied on Level 2 chargers, requiring 6+ hours per charge. This led to off-site charging, increased operational costs, and delayed vehicle turnover.
7
C6AM
Combination
RFID / NFC
Payment
Airport Car Rental
Site
2 months
Time to Deploy
Deployment Highlights
Infrastructure Adaptability
Seven C6AM chargers installed across six airports, utilizing both 208V and 480V power for cost-effective deployment
Fleet Turnover Acceleration
Charge times reduced from 6+ hours to 30 minutes, increasing vehicle turnover by 10x
Eliminated Off-Site Charging
Reduced operational costs & porter liability
Future Expansion
With proven success, additional locations are in the pipeline, leveraging C6AM’s adaptability for scalable fleet electrification.

Airport Rental Fleet
LGA, JFK, MCO, RDU Airports
October 2023
Before XCharge, this rental fleet provider relied on Level 2 chargers, requiring 6+ hours per charge. This led to off-site charging, increased operational costs, and delayed vehicle turnover.
7
C6AM
Combination
RFID / NFC
Payment
Airport Car Rental
Site
2 months
Time to Deploy
Deployment Highlights
Infrastructure Adaptability
Seven C6AM chargers installed across six airports, utilizing both 208V and 480V power for cost-effective deployment
Fleet Turnover Acceleration
Charge times reduced from 6+ hours to 30 minutes, increasing vehicle turnover by 10x
Eliminated Off-Site Charging
Reduced operational costs & porter liability
Future Expansion
With proven success, additional locations are in the pipeline, leveraging C6AM’s adaptability for scalable fleet electrification.

Dock Quick Stop
New Orleans, Louisiana
August 2023
With no public incentives for DC fast charging in the state, Dock Quick Stop’s owner recognized the untapped revenue potential of installing a C6 fast charger.
1
C6AM
95kW / 208Vac
POS / Card
Payment
Gas Station
Site
2 months
Time to Deploy
Deployment Highlights
Optimized for Existing Infrastructure
Scaled charger from 30kW to 62.5kW
High Utilization
3+ charging sessions per day, driving additional store traffic
Strategic Location for Rideshare
Popular among TNC & Uber drivers
Revenue & Expansion Potential
With near full ROI within a year, the owner is considering additional charger installations at other properties.

Dock Quick Stop
New Orleans, Louisiana
August 2023
With no public incentives for DC fast charging in the state, Dock Quick Stop’s owner recognized the untapped revenue potential of installing a C6 fast charger.
1
C6AM
95kW / 208Vac
POS / Card
Payment
Gas Station
Site
2 months
Time to Deploy
Deployment Highlights
Optimized for Existing Infrastructure
Scaled charger from 30kW to 62.5kW
High Utilization
3+ charging sessions per day, driving additional store traffic
Strategic Location for Rideshare
Popular among TNC & Uber drivers
Revenue & Expansion Potential
With near full ROI within a year, the owner is considering additional charger installations at other properties.

Dock Quick Stop
New Orleans, Louisiana
August 2023
With no public incentives for DC fast charging in the state, Dock Quick Stop’s owner recognized the untapped revenue potential of installing a C6 fast charger.
1
C6AM
95kW / 208Vac
POS / Card
Payment
Gas Station
Site
2 months
Time to Deploy
Deployment Highlights
Optimized for Existing Infrastructure
Scaled charger from 30kW to 62.5kW
High Utilization
3+ charging sessions per day, driving additional store traffic
Strategic Location for Rideshare
Popular among TNC & Uber drivers
Revenue & Expansion Potential
With near full ROI within a year, the owner is considering additional charger installations at other properties.

Commercial Workplace
Allen, Texas
July 2023
MD7, an EPC provider, installed a C6AM charger to demonstrate fast charging feasibility within existing power constraints.
1
C6AM
95kW / 208Vac
POS / Card
Payment
Workplace Parking Lot
Site
1 months
Time to Deploy
Deployment Highlights
Installed on existing 208V power
Operating at 32kW until future power upgrades
Minimal Installation Costs
Above-ground conduit approach reduced labor costs
Attracting Both Employees & Public Users
Charger used by 2+ daily users, including passing traffic
Scalability & Future Growth
MD7 gained hands-on experience with XCharge units and is now evaluating additional installations.

Commercial Workplace
Allen, Texas
July 2023
MD7, an EPC provider, installed a C6AM charger to demonstrate fast charging feasibility within existing power constraints.
1
C6AM
95kW / 208Vac
POS / Card
Payment
Workplace Parking Lot
Site
1 months
Time to Deploy
Deployment Highlights
Installed on existing 208V power
Operating at 32kW until future power upgrades
Minimal Installation Costs
Above-ground conduit approach reduced labor costs
Attracting Both Employees & Public Users
Charger used by 2+ daily users, including passing traffic
Scalability & Future Growth
MD7 gained hands-on experience with XCharge units and is now evaluating additional installations.

Commercial Workplace
Allen, Texas
July 2023
MD7, an EPC provider, installed a C6AM charger to demonstrate fast charging feasibility within existing power constraints.
1
C6AM
95kW / 208Vac
POS / Card
Payment
Workplace Parking Lot
Site
1 months
Time to Deploy
Deployment Highlights
Installed on existing 208V power
Operating at 32kW until future power upgrades
Minimal Installation Costs
Above-ground conduit approach reduced labor costs
Attracting Both Employees & Public Users
Charger used by 2+ daily users, including passing traffic
Scalability & Future Growth
MD7 gained hands-on experience with XCharge units and is now evaluating additional installations.

Hotel Wingate by Wyndham
Tinley Park, Illinois
November 2022
The first U.S. deployment of XCharge, this hotel-based DC fast charger utilized existing 208V power, cutting installation costs by over 90 percent.
1
C6AM
95kW / 208Vac
POS / Card
Payment
Hotel
Site
3 months
Time to Deploy
Deployment Highlights
Cost-Effective Installation
Total install cost only $5,000
Higher Revenue Potential
DC fast charging generates 20x more revenue than Level 2 alternatives
Strategic Location
Located near major transportation corridors
Future Expansion
The hotel owner is evaluating additional charger installations at other properties.

Hotel Wingate by Wyndham
Tinley Park, Illinois
November 2022
The first U.S. deployment of XCharge, this hotel-based DC fast charger utilized existing 208V power, cutting installation costs by over 90 percent.
1
C6AM
95kW / 208Vac
POS / Card
Payment
Hotel
Site
3 months
Time to Deploy
Deployment Highlights
Cost-Effective Installation
Total install cost only $5,000
Higher Revenue Potential
DC fast charging generates 20x more revenue than Level 2 alternatives
Strategic Location
Located near major transportation corridors
Future Expansion
The hotel owner is evaluating additional charger installations at other properties.

Hotel Wingate by Wyndham
Tinley Park, Illinois
November 2022
The first U.S. deployment of XCharge, this hotel-based DC fast charger utilized existing 208V power, cutting installation costs by over 90 percent.
1
C6AM
95kW / 208Vac
POS / Card
Payment
Hotel
Site
3 months
Time to Deploy
Deployment Highlights
Cost-Effective Installation
Total install cost only $5,000
Higher Revenue Potential
DC fast charging generates 20x more revenue than Level 2 alternatives
Strategic Location
Located near major transportation corridors
Future Expansion
The hotel owner is evaluating additional charger installations at other properties.

Orlando Utility Commission
Orlando, Florida
November 2024
XCharge North America partnered with the Orlando Utilities Commission (OUC) to deploy the Net Zero Series charger at OUC’s Grid Integration Laboratory (GIL). This project explores how battery-integrated EV charging can enhance grid stability, reduce infrastructure costs, and support microgrid applications.
1
NZS
189kW / 480Vac
RFID / NFC
Payment
Utility
Site
3 months
Time to Deploy
Deployment Highlights
Peak Demand Reduction
NZS lowers grid draw by up to 75 percent, easing strain on utilities
High-Power Output
Operates on a 60-amp breaker, delivering up to 189 kW for rapid charging
Bidirectional Energy Capabilities
Supports backup power and micro-grid applications
Impact & Future Potential
Reduced upgrade costs enables high-speed charging on existing infrastructure. Grid stability improvements provides demand response support during peak usage. Scalability for future deployments helps integrate renewable energy and emergency backup power.

Orlando Utility Commission
Orlando, Florida
November 2024
XCharge North America partnered with the Orlando Utilities Commission (OUC) to deploy the Net Zero Series charger at OUC’s Grid Integration Laboratory (GIL). This project explores how battery-integrated EV charging can enhance grid stability, reduce infrastructure costs, and support microgrid applications.
1
NZS
189kW / 480Vac
RFID / NFC
Payment
Utility
Site
3 months
Time to Deploy
Deployment Highlights
Peak Demand Reduction
NZS lowers grid draw by up to 75 percent, easing strain on utilities
High-Power Output
Operates on a 60-amp breaker, delivering up to 189 kW for rapid charging
Bidirectional Energy Capabilities
Supports backup power and micro-grid applications
Impact & Future Potential
Reduced upgrade costs enables high-speed charging on existing infrastructure. Grid stability improvements provides demand response support during peak usage. Scalability for future deployments helps integrate renewable energy and emergency backup power.

Orlando Utility Commission
Orlando, Florida
November 2024
XCharge North America partnered with the Orlando Utilities Commission (OUC) to deploy the Net Zero Series charger at OUC’s Grid Integration Laboratory (GIL). This project explores how battery-integrated EV charging can enhance grid stability, reduce infrastructure costs, and support microgrid applications.
1
NZS
189kW / 480Vac
RFID / NFC
Payment
Utility
Site
3 months
Time to Deploy
Deployment Highlights
Peak Demand Reduction
NZS lowers grid draw by up to 75 percent, easing strain on utilities
High-Power Output
Operates on a 60-amp breaker, delivering up to 189 kW for rapid charging
Bidirectional Energy Capabilities
Supports backup power and micro-grid applications
Impact & Future Potential
Reduced upgrade costs enables high-speed charging on existing infrastructure. Grid stability improvements provides demand response support during peak usage. Scalability for future deployments helps integrate renewable energy and emergency backup power.

The future of EV Charging starts here
Subscribe to keep up with the latest industry and XCharge North America news, updates, events, and more!

The future of EV Charging starts here
Subscribe to keep up with the latest industry and XCharge North America news, updates, events, and more!

The future of EV Charging starts here
Subscribe to keep up with the latest industry and XCharge North America news, updates, events, and more!