Case Studies

C6AM chargers in a parking lot with a view of las vegas

Kaptyn

Las Vegas, Nevada

May 2024

Kaptyn, a leader in luxury ride-hailing services, needed a scalable fast-charging solution for its high-utilization EV fleet. Their 208V system had a total power capacity of 200kW, creating operational constraints as their fleet expanded.

4

C6AM

Combination

POS / Card

Payment

Parking Lot

Site

3 months

Time to Deploy

Deployment Highlights

Multi-Charger Integration

Three C6AM chargers on 208V, intelligently distributing power across six ports

High-Speed Charging for Quick Turnarounds

One C6AM on 480V, delivering up to 150kW for vehicles needing fast charging

Optimized Energy Management

Intelligent load balancing ensures site power capacity isn't exceeded

Business Impact

Simultaneous charging for up to seven vehicles, reduced downtime & improved fleet availability, and future scalability without significant infrastructure upgrades. By combining 208V load-controlled charging with a 480V fast-charging option, Kaptyn optimized its EV fleet efficiency while keeping infrastructure costs low.

C6AM chargers in a parking lot with a view of las vegas

Kaptyn

Las Vegas, Nevada

May 2024

Kaptyn, a leader in luxury ride-hailing services, needed a scalable fast-charging solution for its high-utilization EV fleet. Their 208V system had a total power capacity of 200kW, creating operational constraints as their fleet expanded.

4

C6AM

Combination

POS / Card

Payment

Parking Lot

Site

3 months

Time to Deploy

Deployment Highlights

Multi-Charger Integration

Three C6AM chargers on 208V, intelligently distributing power across six ports

High-Speed Charging for Quick Turnarounds

One C6AM on 480V, delivering up to 150kW for vehicles needing fast charging

Optimized Energy Management

Intelligent load balancing ensures site power capacity isn't exceeded

Business Impact

Simultaneous charging for up to seven vehicles, reduced downtime & improved fleet availability, and future scalability without significant infrastructure upgrades. By combining 208V load-controlled charging with a 480V fast-charging option, Kaptyn optimized its EV fleet efficiency while keeping infrastructure costs low.

C6AM chargers in a parking lot with a view of las vegas

Kaptyn

Las Vegas, Nevada

May 2024

Kaptyn, a leader in luxury ride-hailing services, needed a scalable fast-charging solution for its high-utilization EV fleet. Their 208V system had a total power capacity of 200kW, creating operational constraints as their fleet expanded.

4

C6AM

Combination

POS / Card

Payment

Parking Lot

Site

3 months

Time to Deploy

Deployment Highlights

Multi-Charger Integration

Three C6AM chargers on 208V, intelligently distributing power across six ports

High-Speed Charging for Quick Turnarounds

One C6AM on 480V, delivering up to 150kW for vehicles needing fast charging

Optimized Energy Management

Intelligent load balancing ensures site power capacity isn't exceeded

Business Impact

Simultaneous charging for up to seven vehicles, reduced downtime & improved fleet availability, and future scalability without significant infrastructure upgrades. By combining 208V load-controlled charging with a 480V fast-charging option, Kaptyn optimized its EV fleet efficiency while keeping infrastructure costs low.

C6AM Charger in a parking lot with trees and buildings behind

Town of Middleburg

Middleburg, Virginia

March 2024

XCharge partnered with the Town of Middleburg, Virginia, to deploy its first DC fast charger at Middleburg Town Hall as part of a pilot program with the Virginia Clean Cities Coalition. The municipality sought to provide a convenient, safe charging option for residents while exploring new revenue streams for the town.

1

C6AM

150kW / 480Vac

POS / Card

Payment

Municipality

Site

6 months

Time to Deploy

Deployment Highlights

Public-Private Partnership

Municipality covered installation, XCharge provided the charger under a revenue-sharing model

Charger Utilization

181 charging sessions logged, delivering 3,806.99 kWh of energy

Community Engagement

Scalability & Future Growth

While no immediate expansion plans exist for this municipality, the project serves as a model for other towns integrating EV infrastructure.

C6AM Charger in a parking lot with trees and buildings behind

Town of Middleburg

Middleburg, Virginia

March 2024

XCharge partnered with the Town of Middleburg, Virginia, to deploy its first DC fast charger at Middleburg Town Hall as part of a pilot program with the Virginia Clean Cities Coalition. The municipality sought to provide a convenient, safe charging option for residents while exploring new revenue streams for the town.

1

C6AM

150kW / 480Vac

POS / Card

Payment

Municipality

Site

6 months

Time to Deploy

Deployment Highlights

Public-Private Partnership

Municipality covered installation, XCharge provided the charger under a revenue-sharing model

Charger Utilization

181 charging sessions logged, delivering 3,806.99 kWh of energy

Community Engagement

Scalability & Future Growth

While no immediate expansion plans exist for this municipality, the project serves as a model for other towns integrating EV infrastructure.

C6AM Charger in a parking lot with trees and buildings behind

Town of Middleburg

Middleburg, Virginia

March 2024

XCharge partnered with the Town of Middleburg, Virginia, to deploy its first DC fast charger at Middleburg Town Hall as part of a pilot program with the Virginia Clean Cities Coalition. The municipality sought to provide a convenient, safe charging option for residents while exploring new revenue streams for the town.

1

C6AM

150kW / 480Vac

POS / Card

Payment

Municipality

Site

6 months

Time to Deploy

Deployment Highlights

Public-Private Partnership

Municipality covered installation, XCharge provided the charger under a revenue-sharing model

Charger Utilization

181 charging sessions logged, delivering 3,806.99 kWh of energy

Community Engagement

Scalability & Future Growth

While no immediate expansion plans exist for this municipality, the project serves as a model for other towns integrating EV infrastructure.

Two C6AM chargers in a parking lot next to a CITGO sign

CITGO Gas Station

Michigan

January 2024

In collaboration with AGI and Folk Oil Company, XCharge deployed the first DC fast charger at a Citgo station nationwide. The C6AM charger was selected for its ease of installation, power flexibility, and proven cold-weather performance.

2

C6AM

150kW / 480Vac

POS / Card

Payment

Gas Station

Site

6 months

Time to Deploy

Deployment Highlights

Overcoming Gas Station Challenges

Installed without disrupting underground fuel lines

Charging Speed & Customer Impact

150kW dual-port DC fast charging, reducing charge times to 20-45 minutes

Retail Benefits

Increased foot traffic and ancillary sales at the convenience store

Future Expansion

Through our charge point operator partner, additional fuel retailer locations are being evaluated for deployment.

Two C6AM chargers in a parking lot next to a CITGO sign

CITGO Gas Station

Michigan

January 2024

In collaboration with AGI and Folk Oil Company, XCharge deployed the first DC fast charger at a Citgo station nationwide. The C6AM charger was selected for its ease of installation, power flexibility, and proven cold-weather performance.

2

C6AM

150kW / 480Vac

POS / Card

Payment

Gas Station

Site

6 months

Time to Deploy

Deployment Highlights

Overcoming Gas Station Challenges

Installed without disrupting underground fuel lines

Charging Speed & Customer Impact

150kW dual-port DC fast charging, reducing charge times to 20-45 minutes

Retail Benefits

Increased foot traffic and ancillary sales at the convenience store

Future Expansion

Through our charge point operator partner, additional fuel retailer locations are being evaluated for deployment.

Two C6AM chargers in a parking lot next to a CITGO sign

CITGO Gas Station

Michigan

January 2024

In collaboration with AGI and Folk Oil Company, XCharge deployed the first DC fast charger at a Citgo station nationwide. The C6AM charger was selected for its ease of installation, power flexibility, and proven cold-weather performance.

2

C6AM

150kW / 480Vac

POS / Card

Payment

Gas Station

Site

6 months

Time to Deploy

Deployment Highlights

Overcoming Gas Station Challenges

Installed without disrupting underground fuel lines

Charging Speed & Customer Impact

150kW dual-port DC fast charging, reducing charge times to 20-45 minutes

Retail Benefits

Increased foot traffic and ancillary sales at the convenience store

Future Expansion

Through our charge point operator partner, additional fuel retailer locations are being evaluated for deployment.

C6AM Charge with a blue hood in a parking garage with windows

Charge Point Operator

Myrtle Beach, South Carolina

October 2023

An operator of primarily Level 2 charging solutions, sought a cost-effective, flexible fast charger for a hotel parking garage. The C6AM charger was installed on 208V power, demonstrating how DC fast charging can be seamlessly integrated into existing infrastructure.

1

C6AM

95kW / 208Vac

QR Code

Payment

Hotel

Site

4 months

Time to Deploy

Deployment Highlights

Faster Charging in Hospitality

Higher-value DC fast charging compared to typical Level 2 setups

Flexibility in Power Requirements

C6AM installed at 208V, showcasing versatility for varied infrastructure

Full Integration with CPO Backend

Seamless communication via custom OCPP backend

Business Impact

This deployment proves the profitability of DC fast charging in hospitality, enabling higher revenue potential than Level 2 alternatives. 

C6AM Charge with a blue hood in a parking garage with windows

Charge Point Operator

Myrtle Beach, South Carolina

October 2023

An operator of primarily Level 2 charging solutions, sought a cost-effective, flexible fast charger for a hotel parking garage. The C6AM charger was installed on 208V power, demonstrating how DC fast charging can be seamlessly integrated into existing infrastructure.

1

C6AM

95kW / 208Vac

QR Code

Payment

Hotel

Site

4 months

Time to Deploy

Deployment Highlights

Faster Charging in Hospitality

Higher-value DC fast charging compared to typical Level 2 setups

Flexibility in Power Requirements

C6AM installed at 208V, showcasing versatility for varied infrastructure

Full Integration with CPO Backend

Seamless communication via custom OCPP backend

Business Impact

This deployment proves the profitability of DC fast charging in hospitality, enabling higher revenue potential than Level 2 alternatives. 

C6AM Charge with a blue hood in a parking garage with windows

Charge Point Operator

Myrtle Beach, South Carolina

October 2023

An operator of primarily Level 2 charging solutions, sought a cost-effective, flexible fast charger for a hotel parking garage. The C6AM charger was installed on 208V power, demonstrating how DC fast charging can be seamlessly integrated into existing infrastructure.

1

C6AM

95kW / 208Vac

QR Code

Payment

Hotel

Site

4 months

Time to Deploy

Deployment Highlights

Faster Charging in Hospitality

Higher-value DC fast charging compared to typical Level 2 setups

Flexibility in Power Requirements

C6AM installed at 208V, showcasing versatility for varied infrastructure

Full Integration with CPO Backend

Seamless communication via custom OCPP backend

Business Impact

This deployment proves the profitability of DC fast charging in hospitality, enabling higher revenue potential than Level 2 alternatives. 

C6AM on a lot at night with two cars next to it

Airport Rental Fleet

LGA, JFK, MCO, RDU Airports

October 2023

Before XCharge, this rental fleet provider relied on Level 2 chargers, requiring 6+ hours per charge. This led to off-site charging, increased operational costs, and delayed vehicle turnover.

7

C6AM

Combination

RFID / NFC

Payment

Airport Car Rental

Site

2 months

Time to Deploy

Deployment Highlights

Infrastructure Adaptability

Seven C6AM chargers installed across six airports, utilizing both 208V and 480V power for cost-effective deployment

Fleet Turnover Acceleration

Charge times reduced from 6+ hours to 30 minutes, increasing vehicle turnover by 10x

Eliminated Off-Site Charging

Reduced operational costs & porter liability

Future Expansion

With proven success, additional locations are in the pipeline, leveraging C6AM’s adaptability for scalable fleet electrification.

C6AM on a lot at night with two cars next to it

Airport Rental Fleet

LGA, JFK, MCO, RDU Airports

October 2023

Before XCharge, this rental fleet provider relied on Level 2 chargers, requiring 6+ hours per charge. This led to off-site charging, increased operational costs, and delayed vehicle turnover.

7

C6AM

Combination

RFID / NFC

Payment

Airport Car Rental

Site

2 months

Time to Deploy

Deployment Highlights

Infrastructure Adaptability

Seven C6AM chargers installed across six airports, utilizing both 208V and 480V power for cost-effective deployment

Fleet Turnover Acceleration

Charge times reduced from 6+ hours to 30 minutes, increasing vehicle turnover by 10x

Eliminated Off-Site Charging

Reduced operational costs & porter liability

Future Expansion

With proven success, additional locations are in the pipeline, leveraging C6AM’s adaptability for scalable fleet electrification.

C6AM on a lot at night with two cars next to it

Airport Rental Fleet

LGA, JFK, MCO, RDU Airports

October 2023

Before XCharge, this rental fleet provider relied on Level 2 chargers, requiring 6+ hours per charge. This led to off-site charging, increased operational costs, and delayed vehicle turnover.

7

C6AM

Combination

RFID / NFC

Payment

Airport Car Rental

Site

2 months

Time to Deploy

Deployment Highlights

Infrastructure Adaptability

Seven C6AM chargers installed across six airports, utilizing both 208V and 480V power for cost-effective deployment

Fleet Turnover Acceleration

Charge times reduced from 6+ hours to 30 minutes, increasing vehicle turnover by 10x

Eliminated Off-Site Charging

Reduced operational costs & porter liability

Future Expansion

With proven success, additional locations are in the pipeline, leveraging C6AM’s adaptability for scalable fleet electrification.

C6AM charger in front of a building

Dock Quick Stop

New Orleans, Louisiana

August 2023

With no public incentives for DC fast charging in the state, Dock Quick Stop’s owner recognized the untapped revenue potential of installing a C6 fast charger.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Gas Station

Site

2 months

Time to Deploy

Deployment Highlights

Optimized for Existing Infrastructure

Scaled charger from 30kW to 62.5kW

High Utilization

3+ charging sessions per day, driving additional store traffic

Strategic Location for Rideshare

Popular among TNC & Uber drivers

Revenue & Expansion Potential

With near full ROI within a year, the owner is considering additional charger installations at other properties.

C6AM charger in front of a building

Dock Quick Stop

New Orleans, Louisiana

August 2023

With no public incentives for DC fast charging in the state, Dock Quick Stop’s owner recognized the untapped revenue potential of installing a C6 fast charger.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Gas Station

Site

2 months

Time to Deploy

Deployment Highlights

Optimized for Existing Infrastructure

Scaled charger from 30kW to 62.5kW

High Utilization

3+ charging sessions per day, driving additional store traffic

Strategic Location for Rideshare

Popular among TNC & Uber drivers

Revenue & Expansion Potential

With near full ROI within a year, the owner is considering additional charger installations at other properties.

C6AM charger in front of a building

Dock Quick Stop

New Orleans, Louisiana

August 2023

With no public incentives for DC fast charging in the state, Dock Quick Stop’s owner recognized the untapped revenue potential of installing a C6 fast charger.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Gas Station

Site

2 months

Time to Deploy

Deployment Highlights

Optimized for Existing Infrastructure

Scaled charger from 30kW to 62.5kW

High Utilization

3+ charging sessions per day, driving additional store traffic

Strategic Location for Rideshare

Popular among TNC & Uber drivers

Revenue & Expansion Potential

With near full ROI within a year, the owner is considering additional charger installations at other properties.

Dark blue C6AM with an orange MD7 logo in a concrete parking lot

Commercial Workplace

Allen, Texas

July 2023

MD7, an EPC provider, installed a C6AM charger to demonstrate fast charging feasibility within existing power constraints.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Workplace Parking Lot

Site

1 months

Time to Deploy

Deployment Highlights

Installed on existing 208V power

Operating at 32kW until future power upgrades

Minimal Installation Costs

Above-ground conduit approach reduced labor costs

Attracting Both Employees & Public Users

Charger used by 2+ daily users, including passing traffic

Scalability & Future Growth

MD7 gained hands-on experience with XCharge units and is now evaluating additional installations.

Dark blue C6AM with an orange MD7 logo in a concrete parking lot

Commercial Workplace

Allen, Texas

July 2023

MD7, an EPC provider, installed a C6AM charger to demonstrate fast charging feasibility within existing power constraints.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Workplace Parking Lot

Site

1 months

Time to Deploy

Deployment Highlights

Installed on existing 208V power

Operating at 32kW until future power upgrades

Minimal Installation Costs

Above-ground conduit approach reduced labor costs

Attracting Both Employees & Public Users

Charger used by 2+ daily users, including passing traffic

Scalability & Future Growth

MD7 gained hands-on experience with XCharge units and is now evaluating additional installations.

Dark blue C6AM with an orange MD7 logo in a concrete parking lot

Commercial Workplace

Allen, Texas

July 2023

MD7, an EPC provider, installed a C6AM charger to demonstrate fast charging feasibility within existing power constraints.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Workplace Parking Lot

Site

1 months

Time to Deploy

Deployment Highlights

Installed on existing 208V power

Operating at 32kW until future power upgrades

Minimal Installation Costs

Above-ground conduit approach reduced labor costs

Attracting Both Employees & Public Users

Charger used by 2+ daily users, including passing traffic

Scalability & Future Growth

MD7 gained hands-on experience with XCharge units and is now evaluating additional installations.

C6AM Charger in front of a pink hotel building

Hotel Wingate by Wyndham

Tinley Park, Illinois

November 2022

The first U.S. deployment of XCharge, this hotel-based DC fast charger utilized existing 208V power, cutting installation costs by over 90 percent.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Hotel

Site

3 months

Time to Deploy

Deployment Highlights

Cost-Effective Installation

Total install cost only $5,000

Higher Revenue Potential

DC fast charging generates 20x more revenue than Level 2 alternatives

Strategic Location

Located near major transportation corridors

Future Expansion

The hotel owner is evaluating additional charger installations at other properties.

C6AM Charger in front of a pink hotel building

Hotel Wingate by Wyndham

Tinley Park, Illinois

November 2022

The first U.S. deployment of XCharge, this hotel-based DC fast charger utilized existing 208V power, cutting installation costs by over 90 percent.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Hotel

Site

3 months

Time to Deploy

Deployment Highlights

Cost-Effective Installation

Total install cost only $5,000

Higher Revenue Potential

DC fast charging generates 20x more revenue than Level 2 alternatives

Strategic Location

Located near major transportation corridors

Future Expansion

The hotel owner is evaluating additional charger installations at other properties.

C6AM Charger in front of a pink hotel building

Hotel Wingate by Wyndham

Tinley Park, Illinois

November 2022

The first U.S. deployment of XCharge, this hotel-based DC fast charger utilized existing 208V power, cutting installation costs by over 90 percent.

1

C6AM

95kW / 208Vac

POS / Card

Payment

Hotel

Site

3 months

Time to Deploy

Deployment Highlights

Cost-Effective Installation

Total install cost only $5,000

Higher Revenue Potential

DC fast charging generates 20x more revenue than Level 2 alternatives

Strategic Location

Located near major transportation corridors

Future Expansion

The hotel owner is evaluating additional charger installations at other properties.

Battery Integrated Charger with Solar Panels

Orlando Utility Commission

Orlando, Florida

November 2024

XCharge North America partnered with the Orlando Utilities Commission (OUC) to deploy the Net Zero Series charger at OUC’s Grid Integration Laboratory (GIL). This project explores how battery-integrated EV charging can enhance grid stability, reduce infrastructure costs, and support microgrid applications.

1

NZS

189kW / 480Vac

RFID / NFC

Payment

Utility

Site

3 months

Time to Deploy

Deployment Highlights

Peak Demand Reduction

NZS lowers grid draw by up to 75 percent, easing strain on utilities

High-Power Output

Operates on a 60-amp breaker, delivering up to 189 kW for rapid charging

Bidirectional Energy Capabilities

Supports backup power and micro-grid applications

Impact & Future Potential

Reduced upgrade costs enables high-speed charging on existing infrastructure. Grid stability improvements provides demand response support during peak usage. Scalability for future deployments helps integrate renewable energy and emergency backup power.

Battery Integrated Charger with Solar Panels

Orlando Utility Commission

Orlando, Florida

November 2024

XCharge North America partnered with the Orlando Utilities Commission (OUC) to deploy the Net Zero Series charger at OUC’s Grid Integration Laboratory (GIL). This project explores how battery-integrated EV charging can enhance grid stability, reduce infrastructure costs, and support microgrid applications.

1

NZS

189kW / 480Vac

RFID / NFC

Payment

Utility

Site

3 months

Time to Deploy

Deployment Highlights

Peak Demand Reduction

NZS lowers grid draw by up to 75 percent, easing strain on utilities

High-Power Output

Operates on a 60-amp breaker, delivering up to 189 kW for rapid charging

Bidirectional Energy Capabilities

Supports backup power and micro-grid applications

Impact & Future Potential

Reduced upgrade costs enables high-speed charging on existing infrastructure. Grid stability improvements provides demand response support during peak usage. Scalability for future deployments helps integrate renewable energy and emergency backup power.

Battery Integrated Charger with Solar Panels

Orlando Utility Commission

Orlando, Florida

November 2024

XCharge North America partnered with the Orlando Utilities Commission (OUC) to deploy the Net Zero Series charger at OUC’s Grid Integration Laboratory (GIL). This project explores how battery-integrated EV charging can enhance grid stability, reduce infrastructure costs, and support microgrid applications.

1

NZS

189kW / 480Vac

RFID / NFC

Payment

Utility

Site

3 months

Time to Deploy

Deployment Highlights

Peak Demand Reduction

NZS lowers grid draw by up to 75 percent, easing strain on utilities

High-Power Output

Operates on a 60-amp breaker, delivering up to 189 kW for rapid charging

Bidirectional Energy Capabilities

Supports backup power and micro-grid applications

Impact & Future Potential

Reduced upgrade costs enables high-speed charging on existing infrastructure. Grid stability improvements provides demand response support during peak usage. Scalability for future deployments helps integrate renewable energy and emergency backup power.